Warning: include(/home/acircuit/public_html/wp-content/plugins/js_composer/config/content/shortcode-vc-single-image.php): failed to open stream: No such file or directory in /home/acircuit/public_html/wp-content/plugins/js_composer/include/classes/core/class-wpb-map.php on line 756

Warning: include(): Failed opening '/home/acircuit/public_html/wp-content/plugins/js_composer/config/content/shortcode-vc-single-image.php' for inclusion (include_path='.:/usr/local/php71/pear') in /home/acircuit/public_html/wp-content/plugins/js_composer/include/classes/core/class-wpb-map.php on line 756

Above you can see one of our units which carry all the transformer and ring main units, these systems can be great for any SSEG system.

It may look like hard work but just think that once this container is lowered into position we have everything already set up inside including lighting and a full temperature controlled heating system.

When working on site we have to adhere to all safety regulations and this photo shows how the area must be kept clear of personnel when the switch gear is being activated.

The earthing system must come up to the standards laid down by the adoption company.